Happenings at the lake house today...
 |
| Lots going on at the lake house today. This is the crew from our electrical contractor installing wires so we can have electricity at our (eventually) dock! Simultaneously, the landscapers are installing pipes to the water so we can pump from the lake to irrigate our lawn--best part--free water! |
 |
| The bead board ceiling being installed on our back porch--highest point is 14 feet!!! |
 |
| Installing underground irrigation in the front yard. |
 |
| David checking on the progress. |
the sidewalk really makes it feel like it's coming together!!